Last update at: 2024-10-14T17:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_006 | Inactive | Planned | Production unavailability | 2024-10-14T16:32:32+01:00 | 2024-10-14T14:00:00+01:00 | 2024-10-14T15:30:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_006 | Inactive | Planned | Production unavailability | 2024-10-14T16:32:32+01:00 | 2024-10-14T14:00:00+01:00 | 2024-10-14T15:30:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_005 | Dismissed | Planned | Production unavailability | 2024-10-09T16:05:04+01:00 | 2024-10-14T14:00:00+01:00 | 2024-10-14T15:30:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_005 | Dismissed | Planned | Production unavailability | 2024-10-09T16:04:24+01:00 | 2024-10-14T14:00:00+01:00 | 2024-10-14T15:30:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_004 | Dismissed | Planned | Production unavailability | 2024-10-09T14:16:27+01:00 | 2024-10-14T11:00:00+01:00 | 2024-10-14T12:30:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_004 | Dismissed | Planned | Production unavailability | 2024-10-09T14:18:32+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009487_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:31:04+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009486_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:27:17+01:00 | 2024-10-14T13:01:00+01:00 | 2024-10-14T15:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009544_003 | Dismissed | Unplanned | Production unavailability | 2024-10-14T15:09:05+01:00 | 2024-10-13T13:20:00+01:00 | 2024-10-14T17:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009544_002 | Dismissed | Unplanned | Production unavailability | 2024-10-14T09:59:38+01:00 | 2024-10-13T13:20:00+01:00 | 2024-10-14T17:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009544_001 | Dismissed | Unplanned | Production unavailability | 2024-10-13T13:20:22+01:00 | 2024-10-13T13:20:00+01:00 | 2024-10-14T13:25:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_006 | Inactive | Planned | Production unavailability | 2024-10-14T15:02:32+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_005 | Dismissed | Planned | Production unavailability | 2024-10-09T16:01:50+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009489_005 | Inactive | Planned | Production unavailability | 2024-10-14T15:02:32+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009490_005 | Inactive | Planned | Production unavailability | 2024-10-14T15:02:32+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009490_004 | Dismissed | Planned | Production unavailability | 2024-10-09T16:03:42+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009489_004 | Dismissed | Planned | Production unavailability | 2024-10-09T16:02:26+01:00 | 2024-10-14T12:30:00+01:00 | 2024-10-14T14:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_004 | Dismissed | Planned | Production unavailability | 2024-10-09T14:20:10+01:00 | 2024-10-14T14:00:00+01:00 | 2024-10-14T15:30:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009489_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009490_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009489_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009490_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009490_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:35:05+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009488_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:32:38+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009489_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:33:49+01:00 | 2024-10-14T11:01:00+01:00 | 2024-10-14T13:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_006 | Inactive | Planned | Production unavailability | 2024-10-14T13:32:32+01:00 | 2024-10-14T10:30:00+01:00 | 2024-10-14T12:30:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_005 | Dismissed | Planned | Production unavailability | 2024-10-14T10:23:08+01:00 | 2024-10-14T10:30:00+01:00 | 2024-10-14T12:30:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_004 | Dismissed | Planned | Production unavailability | 2024-10-09T16:00:28+01:00 | 2024-10-14T11:00:00+01:00 | 2024-10-14T12:30:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_003 | Dismissed | Planned | Production unavailability | 2024-10-09T09:04:22+01:00 | 2024-10-14T09:00:00+01:00 | 2024-10-14T11:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_002 | Dismissed | Planned | Production unavailability | 2024-10-03T12:23:19+01:00 | 2024-10-14T09:00:00+01:00 | 2024-10-14T11:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009491_001 | Dismissed | Planned | Production unavailability | 2024-10-01T16:36:09+01:00 | 2024-10-14T09:00:00+01:00 | 2024-10-14T11:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009543_002 | Dismissed | Unplanned | Production unavailability | 2024-10-13T13:28:24+01:00 | 2024-10-13T11:55:00+01:00 | 2024-10-13T13:28:00+01:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009543_001 | Dismissed | Unplanned | Production unavailability | 2024-10-13T11:56:45+01:00 | 2024-10-13T11:55:00+01:00 | 2024-10-13T16:00:00+01:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009542_002 | Inactive | Planned | Consumption unavailability | 2024-10-13T13:02:32+01:00 | 2024-10-13T05:45:00+01:00 | 2024-10-13T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009542_001 | Dismissed | Planned | Consumption unavailability | 2024-10-13T04:53:05+01:00 | 2024-10-13T05:45:00+01:00 | 2024-10-13T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_007 | Active | Planned | Production unavailability | 2024-10-11T14:00:34+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_006 | Dismissed | Planned | Production unavailability | 2024-10-04T11:30:37+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-11T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_005 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_004 | Dismissed | Planned | Production unavailability | 2024-10-01T10:55:08+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:15+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-04T17:00:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:59:06+01:00 | 2024-09-20T23:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009453_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:48:35+01:00 | 2024-09-20T20:00:00+01:00 | 2024-09-27T17:00:00+01:00 | MW | 118 | 39 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_006 | Active | Planned | Production unavailability | 2024-10-11T14:00:14+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-18T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_005 | Dismissed | Planned | Production unavailability | 2024-10-04T11:31:54+01:00 | 2024-09-20T23:00:00+01:00 | 2024-10-11T17:00:00+01:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |