Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 14 15 16 17 18 >
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_011 Inactive Planned Production unavailability 2024-09-20T09:02:32+01:00 2024-07-24T17:00:00+01:00 2024-09-20T08:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_010 Dismissed Planned Production unavailability 2024-09-20T07:56:54+01:00 2024-07-24T17:00:00+01:00 2024-09-20T08:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_009 Dismissed Planned Production unavailability 2024-09-13T15:45:45+01:00 2024-07-24T17:00:00+01:00 2024-09-20T17:00:00+01:00 MW 118 39 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_008 Dismissed Planned Production unavailability 2024-09-06T09:51:15+01:00 2024-07-24T17:00:00+01:00 2024-09-13T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_008 Inactive Planned Production unavailability 2024-09-20T09:02:32+01:00 2024-08-09T11:29:00+01:00 2024-09-20T08:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_007 Dismissed Planned Production unavailability 2024-09-20T07:57:21+01:00 2024-08-09T11:29:00+01:00 2024-09-20T08:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_007 Dismissed Planned Production unavailability 2024-08-22T10:33:49+01:00 2024-07-24T17:00:00+01:00 2024-09-06T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_006 Dismissed Planned Production unavailability 2024-08-16T10:41:40+01:00 2024-07-24T17:00:00+01:00 2024-08-23T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_006 Dismissed Planned Production unavailability 2024-09-13T15:43:46+01:00 2024-08-09T11:29:00+01:00 2024-09-20T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_005 Dismissed Planned Production unavailability 2024-09-06T09:51:34+01:00 2024-08-09T11:29:00+01:00 2024-09-13T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_005 Dismissed Planned Production unavailability 2024-08-09T11:29:01+01:00 2024-07-24T17:00:00+01:00 2024-08-16T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_004 Dismissed Planned Production unavailability 2024-08-07T12:02:15+01:00 2024-07-24T17:00:00+01:00 2024-08-09T17:00:00+01:00 MW 107 50 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_004 Dismissed Planned Production unavailability 2024-08-22T10:34:07+01:00 2024-08-09T11:29:00+01:00 2024-09-06T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_003 Dismissed Planned Production unavailability 2024-08-16T10:41:23+01:00 2024-08-09T11:29:00+01:00 2024-08-23T17:00:00+01:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_003 Dismissed Planned Production unavailability 2024-08-02T10:38:51+01:00 2024-07-24T17:00:00+01:00 2024-08-09T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_002 Dismissed Planned Production unavailability 2024-07-29T15:13:37+01:00 2024-07-24T17:00:00+01:00 2024-08-02T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_002 Dismissed Planned Production unavailability 2024-08-16T10:41:08+01:00 2024-08-09T11:29:00+01:00 2024-08-16T17:00:00+01:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_001 Dismissed Planned Production unavailability 2024-08-09T11:30:12+01:00 2024-08-09T11:29:00+01:00 2024-08-16T17:00:00+01:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009277_001 Dismissed Planned Production unavailability 2024-07-25T17:04:41+01:00 2024-07-24T17:00:00+01:00 2024-07-29T17:00:00+01:00 MW 157 0 157 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_003 Inactive Planned Consumption unavailability 2024-09-20T07:02:32+01:00 2024-09-19T13:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_002 Dismissed Planned Consumption unavailability 2024-09-19T15:04:51+01:00 2024-09-19T13:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009447_002 Inactive Planned Production unavailability 2024-09-20T07:02:32+01:00 2024-09-20T00:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009447_001 Dismissed Planned Production unavailability 2024-09-19T15:01:53+01:00 2024-09-20T00:00:00+01:00 2024-09-20T06:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009443_001 Dismissed Planned Consumption unavailability 2024-09-19T07:51:04+01:00 2024-09-19T13:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009446_002 Inactive Planned Production unavailability 2024-09-20T01:02:32+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009450_002 Inactive Planned Consumption unavailability 2024-09-20T01:02:32+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009450_001 Dismissed Planned Consumption unavailability 2024-09-19T15:05:54+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009446_001 Dismissed Planned Production unavailability 2024-09-19T15:00:39+01:00 2024-09-19T18:00:00+01:00 2024-09-20T00:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_003 Inactive Planned Production unavailability 2024-09-19T19:02:32+01:00 2024-09-19T13:00:00+01:00 2024-09-19T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_002 Dismissed Planned Production unavailability 2024-09-19T14:59:22+01:00 2024-09-19T13:00:00+01:00 2024-09-19T18:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009442_001 Dismissed Planned Production unavailability 2024-09-19T07:49:57+01:00 2024-09-19T13:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009440_002 Inactive Planned Production unavailability 2024-09-19T14:02:32+01:00 2024-09-19T11:00:00+01:00 2024-09-19T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009441_002 Inactive Planned Consumption unavailability 2024-09-19T14:02:32+01:00 2024-09-19T11:00:00+01:00 2024-09-19T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009441_001 Dismissed Planned Consumption unavailability 2024-09-19T07:48:29+01:00 2024-09-19T11:00:00+01:00 2024-09-19T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009440_001 Dismissed Planned Production unavailability 2024-09-19T07:47:01+01:00 2024-09-19T11:00:00+01:00 2024-09-19T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009435_003 Inactive Planned Consumption unavailability 2024-09-19T12:02:33+01:00 2024-09-18T14:00:00+01:00 2024-09-19T11:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009434_003 Inactive Planned Production unavailability 2024-09-19T12:02:33+01:00 2024-09-18T14:00:00+01:00 2024-09-19T11:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009434_002 Dismissed Planned Production unavailability 2024-09-19T07:45:36+01:00 2024-09-18T14:00:00+01:00 2024-09-19T11:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009435_002 Dismissed Planned Consumption unavailability 2024-09-19T07:44:42+01:00 2024-09-18T14:00:00+01:00 2024-09-19T11:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009435_001 Dismissed Planned Consumption unavailability 2024-09-18T09:23:41+01:00 2024-09-18T14:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009434_001 Dismissed Planned Production unavailability 2024-09-18T09:19:17+01:00 2024-09-18T14:00:00+01:00 2024-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009433_004 Inactive Planned Production unavailability 2024-09-18T19:32:32+01:00 2024-09-18T10:00:00+01:00 2024-09-18T18:30:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009433_003 Dismissed Planned Production unavailability 2024-09-18T18:15:40+01:00 2024-09-18T10:00:00+01:00 2024-09-18T18:30:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009433_002 Dismissed Planned Production unavailability 2024-09-18T08:55:50+01:00 2024-09-18T10:00:00+01:00 2024-09-18T22:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009433_001 Dismissed Planned Production unavailability 2024-09-18T08:50:22+01:00 2024-09-18T09:00:00+01:00 2024-09-18T21:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009436_002 Inactive Planned Production unavailability 2024-09-18T15:02:32+01:00 2024-09-18T12:00:00+01:00 2024-09-18T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009437_002 Inactive Planned Consumption unavailability 2024-09-18T15:02:32+01:00 2024-09-18T12:00:00+01:00 2024-09-18T14:00:00+01:00 MW 150 0 150 Shutdown
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009437_001 Dismissed Planned Consumption unavailability 2024-09-18T09:34:58+01:00 2024-09-18T12:00:00+01:00 2024-09-18T14:00:00+01:00 MW 150 0 150 Shutdown
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009436_001 Dismissed Planned Production unavailability 2024-09-18T09:31:11+01:00 2024-09-18T12:00:00+01:00 2024-09-18T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006642_011 Inactive Planned Production unavailability 2024-09-18T13:02:32+01:00 2024-08-23T07:00:00+01:00 2024-09-18T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A