Last update at: 2024-10-14T17:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 25 26 27 28 29 > | ||||||||||||||||||
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009327_001 | Dismissed | Unplanned | Production unavailability | 2024-08-07T09:37:17+01:00 | 2024-08-07T09:20:00+01:00 | 2024-08-07T09:55:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009325_002 | Dismissed | Planned | Production unavailability | 2024-08-06T10:38:04+01:00 | 2024-08-06T11:00:00+01:00 | 2024-08-06T11:30:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009325_001 | Dismissed | Planned | Production unavailability | 2024-08-06T10:35:17+01:00 | 2024-08-06T11:00:00+01:00 | 2024-08-06T11:30:00+01:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009320_002 | Inactive | Planned | Production unavailability | 2024-08-05T14:02:32+01:00 | 2024-08-05T12:59:00+01:00 | 2024-08-05T13:00:00+01:00 | MW | 164 | 1 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009320_001 | Dismissed | Planned | Production unavailability | 2024-08-05T12:59:05+01:00 | 2024-08-05T12:59:00+01:00 | 2024-08-05T13:00:00+01:00 | MW | 164 | 1 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009321_002 | Dismissed | Planned | Production unavailability | 2024-08-05T13:53:16+01:00 | 2024-08-05T13:50:00+01:00 | 2024-08-05T14:00:00+01:00 | MW | 5 | 160 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009321_001 | Dismissed | Planned | Production unavailability | 2024-08-05T13:49:33+01:00 | 2024-08-05T13:50:00+01:00 | 2024-08-05T14:00:00+01:00 | MW | 5 | 160 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009319_002 | Dismissed | Planned | Production unavailability | 2024-08-05T11:53:35+01:00 | 2024-09-07T09:42:00+01:00 | 2024-09-07T09:43:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009319_001 | Dismissed | Planned | Production unavailability | 2024-08-05T11:37:33+01:00 | 2024-09-07T09:42:00+01:00 | 2024-09-07T09:43:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009307_002 | Dismissed | Planned | Production unavailability | 2024-08-05T11:45:25+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009307_001 | Dismissed | Planned | Production unavailability | 2024-08-03T08:29:45+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009318_002 | Dismissed | Planned | Production unavailability | 2024-08-05T11:18:53+01:00 | 2024-08-05T11:30:00+01:00 | 2024-08-05T12:00:00+01:00 | MW | 63 | 63 | 126 | Failure | Testing |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009318_001 | Dismissed | Planned | Production unavailability | 2024-08-05T11:15:05+01:00 | 2024-08-05T11:30:00+01:00 | 2024-08-05T12:00:00+01:00 | MW | 63 | 63 | 126 | Failure | Testing |
Wind Offshore | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009315_002 | Inactive | Planned | Production unavailability | 2024-08-04T18:02:32+01:00 | 2024-08-04T13:00:00+01:00 | 2024-08-04T17:00:00+01:00 | MW | 405 | 350 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009315_001 | Dismissed | Planned | Production unavailability | 2024-08-03T18:28:53+01:00 | 2024-08-04T13:00:00+01:00 | 2024-08-04T17:00:00+01:00 | MW | 405 | 350 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009316_005 | Inactive | Planned | Production unavailability | 2024-08-04T15:02:32+01:00 | 2024-08-03T22:30:00+01:00 | 2024-08-04T14:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009316_004 | Dismissed | Planned | Production unavailability | 2024-08-04T13:11:26+01:00 | 2024-08-03T22:30:00+01:00 | 2024-08-04T14:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009316_003 | Dismissed | Planned | Production unavailability | 2024-08-04T10:40:45+01:00 | 2024-08-03T22:30:00+01:00 | 2024-08-04T18:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009316_002 | Dismissed | Planned | Production unavailability | 2024-08-04T02:48:42+01:00 | 2024-08-03T22:30:00+01:00 | 2024-08-04T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009316_001 | Dismissed | Planned | Production unavailability | 2024-08-03T22:10:45+01:00 | 2024-08-03T22:30:00+01:00 | 2024-08-04T06:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009314_002 | Inactive | Unplanned | Production unavailability | 2024-08-03T17:32:32+01:00 | 2024-08-03T16:14:00+01:00 | 2024-08-03T16:25:00+01:00 | MW | 0 | 165 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009314_001 | Dismissed | Unplanned | Production unavailability | 2024-08-03T16:15:29+01:00 | 2024-08-03T16:14:00+01:00 | 2024-08-03T16:25:00+01:00 | MW | 0 | 165 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009312_002 | Inactive | Planned | Production unavailability | 2024-08-03T16:32:32+01:00 | 2024-08-03T15:15:00+01:00 | 2024-08-03T15:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009312_001 | Dismissed | Planned | Production unavailability | 2024-08-03T15:13:14+01:00 | 2024-08-03T15:15:00+01:00 | 2024-08-03T15:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009313_002 | Dismissed | Planned | Production unavailability | 2024-08-03T16:01:46+01:00 | 2024-08-03T15:55:00+01:00 | 2024-08-03T16:30:00+01:00 | MW | 5 | 103 | 108 | Failure | Testing |
Wind Onshore | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009313_001 | Dismissed | Planned | Production unavailability | 2024-08-03T15:54:42+01:00 | 2024-08-03T15:55:00+01:00 | 2024-08-03T16:30:00+01:00 | MW | 5 | 103 | 108 | Failure | Testing |
Wind Onshore | 10YGB----------A |
T_CLDCW-1 | 48W00000CLDCW-17 | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000009311_002 | Dismissed | Planned | Production unavailability | 2024-08-03T14:48:52+01:00 | 2024-08-03T15:00:00+01:00 | 2024-08-03T16:00:00+01:00 | MW | 187 | 0 | 187 | Foreseen Maintenance | Testing |
Wind Onshore | 10YGB----------A |
T_CLDCW-1 | 48W00000CLDCW-17 | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000009311_001 | Dismissed | Planned | Production unavailability | 2024-08-03T14:45:51+01:00 | 2024-08-03T15:00:00+01:00 | 2024-08-03T16:00:00+01:00 | MW | 187 | 0 | 187 | Foreseen Maintenance | Testing |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000009309_002 | Dismissed | Planned | Production unavailability | 2024-08-03T14:38:18+01:00 | 2024-08-03T15:00:00+01:00 | 2024-08-03T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Testing |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000009309_001 | Dismissed | Planned | Production unavailability | 2024-08-03T14:28:46+01:00 | 2024-08-03T15:00:00+01:00 | 2024-08-03T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Testing |
Wind Onshore | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009296_002 | Dismissed | Planned | Production unavailability | 2024-08-02T16:52:45+01:00 | 2029-08-02T16:48:00+01:00 | 2029-08-02T16:49:00+01:00 | MW | 0 | 755 | 755 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009296_001 | Dismissed | Planned | Production unavailability | 2024-08-02T16:51:13+01:00 | 2029-08-02T16:48:00+01:00 | 2029-08-02T16:49:00+01:00 | MW | 0 | 755 | 755 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009293_002 | Dismissed | Planned | Production unavailability | 2024-08-02T16:31:48+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009293_001 | Dismissed | Planned | Production unavailability | 2024-08-02T14:46:10+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009295_002 | Dismissed | Planned | Production unavailability | 2024-08-02T16:30:55+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009295_001 | Dismissed | Planned | Production unavailability | 2024-08-02T14:52:40+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009294_003 | Dismissed | Planned | Production unavailability | 2024-08-02T16:28:27+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009294_002 | Dismissed | Planned | Production unavailability | 2024-08-02T16:09:59+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-2 | 48W00000STLGW-2C | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009294_001 | Dismissed | Planned | Production unavailability | 2024-08-02T14:49:31+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 0 | 108 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009290_005 | Inactive | Unplanned | Production unavailability | 2024-07-31T20:02:32+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009291_005 | Inactive | Unplanned | Production unavailability | 2024-07-31T20:02:32+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009288_005 | Inactive | Unplanned | Production unavailability | 2024-07-31T20:02:32+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009289_005 | Inactive | Unplanned | Production unavailability | 2024-07-31T20:02:32+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009289_004 | Dismissed | Unplanned | Production unavailability | 2024-07-31T17:47:09+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009291_004 | Dismissed | Unplanned | Production unavailability | 2024-07-31T17:46:11+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009290_004 | Dismissed | Unplanned | Production unavailability | 2024-07-31T17:46:26+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009288_004 | Dismissed | Unplanned | Production unavailability | 2024-07-31T17:47:29+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T19:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009291_003 | Dismissed | Unplanned | Production unavailability | 2024-07-31T15:51:14+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T18:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009290_003 | Dismissed | Unplanned | Production unavailability | 2024-07-31T15:51:03+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T18:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009288_003 | Dismissed | Unplanned | Production unavailability | 2024-07-31T15:50:37+01:00 | 2024-07-31T09:39:00+01:00 | 2024-07-31T18:00:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |